vvpm
Wilshire Vermont MTD Entrance
Four Inch Wide Seismic Joint / Separation
Between Two Structures 
Completed Emseal 20H-Preformed expanding polyurethane foam with urethane top coat.
Ready for installation of cover plate supports.
Install cover plate support bars.

Support bars complete and ready
for final tile and concrete
before installation of
stainless steel cover plate.

View at intersection of vertical below grade Emseal to horizontal Emseal.
At both ends of deck structure the seismic joint continues down underground 16 feet.
Remove Emseal from precompressed packaging
& remove protective film.

Prepare joint surfaces and install epoxy bonding agent at joint edges.

Heat joint edges of the Emseal to open cells, install Emseal and shim in place until it expands into the epoxy.